Machine Course Information
Below you will find a list of the most popular categories of machines at Staffs Operator Training along with their uses and length of course (for non experienced workers).
Other machine categories we supply training on can be found on the CPCS page and the course dates in the training schedule.
360° Excavator
Uses:
Excavations, Bulk earth moving, House building (Foundations), Landscaping, Coal, Quarry, Pipelines. Has many attachments such as different sized buckets and breakers for breaking rocks. Also comes in a variety of sizes up to 250 tonnes.
Course Duration:
2 weeks / 70 hours
180° Excavator
Uses:
Excavations, House building (Foundations), Landscaping, General utility machine, Will travel to job location without the need for heavy transport.The machine features an arm on the back and a versatile ’4 in 1′ bucket on the front which includes fold away forks.
Course Duration:
2 weeks / 70 hours
Telescopic Materials Handler
Uses:
Extremely versatile machine, a bucket can be fitted as well as forks. 4WD/4W Steer capability. With a fully extended reach of 13m. Often used in house building because of its ability to lift materials onto scaffolding.
Course Duration:
1 week / 35 hours
Dump Truck
Uses:
Sometimes called a ‘Bendy’ because it articulates in the center. Used for hauling all types of materials on bulk ‘muck’ shifts.
Course Duration:
1 week / 35 hours
Loading Shovel
Uses:
Articulated, some machines you can remove the bucket and fit different attachments. Used for loading duties, most machines have a single joystick for controlling the lifting arm.
Course Duration:
1 week / 35 hours
Forward Tipping Dumper
Uses:
Up to ten tonnes, a good introduction into the industry, useful for tight spaces and all aspects of site work for hauling and transporting materials.
Course Duration:
3 days / 24 hours
Mobile Elevated Work Platform (MEWP)
Uses:
Accessing platform, comes in 3 different categories:
Boom – ‘Cherry Picker’ (in picture)
Scissor – ‘Flying Carpet’
Self-propelled (on wheels).
Course Duration:
3 days / 21 hours


